Pioneer Water Rehabilitation – Phase 2

Project Location

Pioneer, CA

Project Costs

$5,000,000
Phase 2 Pioneer California water rehab

Project to improve the water distribution system with ~7,400’ of 12” pipeline in Buckhorn Ridge Road, 4 pressure reducing stations (one on 12” mainline, 3 on existing lines), and a new booster pump station adjacent to the existing tank B pump station.   Due to the extremely short design window (~3 months to complete predesign, design, and construction plans and specifications), Bailey Civil Engineering teamed with Coleman Engineering on this project, who completed the pump station design and plan and specification portion.  Bailey Civil Engineering was the prime consultant on the project and completed the entirety of the pipeline and PRV station design, construction plan and specifications including pre-design work during the design phase to present downstream pressure zone options and confirm pipe size and material options.  Design challenges included the accelerated timeline, managing additional pressure zone creation with the design of PRV stations on the existing system, and designing multiple new pipeline interconnects with the existing distribution system for maximum operational flexibility.  All project work was completed between late January and early May 2020 with project construction completed in 2020.  Bailey Civil Engineering completed project construction management for the first several months of the project until they selected a CM consultant.  The Owner requested we complete the entirety of project construction management but other project commitments precluded this being possible.

Back to Featured Projects