Pioneer Water Rehabilitation – Phase 3

Project to replace two existing tanks and install a new pipeline to connect the new tanks to the previously constructed phase 2 pipeline. The project site contained a 250,000-gallon bolted steel tank (taken offline some years prior due to disrepair/age) and a 500,000-gallon welded steel tank (also in disrepair/suffering from age) that needed to remain in service until the new tanks were online. The replacement project included the construction of two new 1 million gallon welded steel tanks, site piping improvements, and 1,600 feet of 12” transmission main. Bailey Civil Engineering was asked by Keller Associates to team up on the project and completed resident engineering services for the project including all inspections except coating inspection (CSI Services) and geotechnical testing (Geocon Consultants Inc.). Bailey Civil Engineering completed the easement acquisition and design of a storm drain extension during the project and resolved several design problems in the field. The tanks went into service in August of 2023 and the project is substantially complete as of November 2023.